Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Thursday, June 5
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
Breaking News
Bayside News
Home»News»Dredging begins again
News

Dredging begins again

Bayside NewsBy Bayside News29 March 2017No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Clear way: Dredging works at Mordialloc Creek are due to begin this week. Picture: Gary Sissons
Share
Facebook Twitter LinkedIn Pinterest Email
Clear way: Dredging works at Mordialloc Creek are due to begin this week. Picture: Gary Sissons

DREDGING in and around Mordialloc Creek’s entrance will begin this week to clear natural sand build-up, a hazard for recreational and commercial boat operators.

“The works form part of Parks Victoria’s ongoing dredging program to ensure the continuation of safe boating access within Port Phillip and Western Port” Parks Victoria local ports and waterways senior manager Victor Teoh said.

Mr Teoh said the freshly dredged material contains organic material, mostly seaweed which gives the sand a dark colour and odour.  Visitors to the beach should not be concerned since the sand is tested on a regular basis.

“While the dredged sand may look and smell mildly unpleasant when it first comes out of the water, after a few days exposure to the air and sun, the sand will bleach to the normal colour and lose the odour.”

Mariners should travel at less than 5 knots during the dredging process in the channel and near the dredge. 

The dredger cannot easily manoeuvre during dredging works and all vessel operators should observe marks on the dredge and pass safely on the side showing two black diamonds.

Maintenance dredging at Mordialloc Creek was last carried out in December last year and will run for 3-6 days, depending upon the weather.

See parks.vic.gov.au or call 13 19 63 for more information about the dredging.

First published in the Chelsea Mordialloc Mentone News – 29 March 2017

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Bayside News
Bayside News

Related Posts

New conditions applied to grants

4 June 2025

Justice centre opens doors

4 June 2025

Fire tears through shop

3 June 2025
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

3 June 2025
Peninsula Kids Magazine

Click Here to Read

3 June 2025
Property of the Week

34 Pine Hill Drive, Frankston

21 March 2025
Council Watch

Stood down councillor not subject to code of conduct

23 April 2025

Cash bounty to catch vandals

8 April 2025
100 Years Ago this Week

Fraudulent Sale Of Car – Accused Man’s Admission

3 June 2025
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.