Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Monday, March 9
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Out with the old, in with the new at TAFE
News

Out with the old, in with the new at TAFE

Brodie CowburnBy Brodie Cowburn8 November 2021Updated:18 July 2024No Comments3 Mins Read
Facebook Twitter LinkedIn Email Reddit Threads Copy Link
DEMOLITION crews at work at Chisholm TAFE Frankston campus. Pictures: Gary Sissons
Share
Facebook Twitter LinkedIn Email Reddit Threads Copy Link

DEMOLITION works are underway at two of the oldest buildings on the Chisholm TAFE site in Frankston.

The C and E buildings by Quality Street are currently being knocked down. The buildings are being demolished to make way for the $67 million stage two works taking place at Chisholm TAFE.

Chisholm’s director of campus services, infrastructure and IT, Richard Pratten, said the old buildings are no longer fit for purpose.

“Many of our past students have shared wonderful memories from their time at the Frankston campus, which  have been gratefully received by our team. We hope that they look back in fondness for our old buildings and are  excited to welcome the new facility which will give the next generation of students the cutting-edge learning  experience that they also received when studying with us”, Mr Pratten said.

“Local council was consulted during the development of the concept design in 2019. Following the announcement of funding for the stage 2 project a number of community consultation sessions were held prior to the commencement of the demolition. Community consultation revealed the emotional attachment that many of our local residents and past students have with the existing building. We are actively seeking their stories and memories so that they can be documented and preserved.

“The new building will provide an environmentally sustainable state of the art teaching and learning space with flexibility and efficiency.  The buildings have been adapted and repurposed several times over their lifetime, recent reviews have shown that the cost to maintain the existing building will continue to grow and become untenable into the future.  There is a need to create spaces and the facilities that align with the way we teach our students today and into the future. We are moving from traditional classroom formats to spaces that allow cross disciplinary interaction, flexibility and spaces for students and staff to engage spontaneously.”

Over the years, the old C and E buildings have been used as  a secondary and technical trade school. Two decades ago they began to house Chisholm’s art and design facilities, as well as its library.

Chisholm director and CEO Stephen Varty said that the works would add new learning space to “respond to drawing industry needs” including “community services, VCE/VCAL and foundation college courses, along with bespoke spaces for art and design.” 

“The precinct will also bring together a range of student support services into a student hub, along with a gallery space and onsite food and retail outlets,” he said. 

Committee for Greater Frankston president Rod Evenden said “when completed, Frankston’s Chisholm campus will be Victoria’s largest technical training institute and meet our local businesses’ demand for job-ready graduates.”

The $85 million stage one works at the Frankston campus were finished in 2019. Work on stage two is projected to be complete in 2023.

First published in the Frankston Times – 9 November 2021

Brodie Cowburn
Brodie Cowburn

Related Posts

Allegedly unlicensed and double the speed limit on the Mornington Peninsula Freeway

8 March 2026

Further two charged following alleged crime spree

6 March 2026

Community consultation on Australia Day

5 March 2026
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

2 February 2026
Peninsula Kids Magazine

Click Here to Read

9 December 2025
Property of the Week

563 Nepean Highway, FRANKSTON

20 January 2026
Council Watch

Submissions open on vacant shop rates

24 February 2026

Overseas junket a ‘success’ – mayor

25 November 2025
100 Years Ago this Week

Benefit Concert in aid of Bush Fire Relief Fund

5 March 2026
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.