Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Saturday, May 10
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Hastings the most costly port option
News

Hastings the most costly port option

Keith PlattBy Keith Platt20 March 2017Updated:20 March 2017No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
INFRASTRUCTURE Victoria’s latest discussion paper suggests - subject to further investigation - that ships carrying vehicles to the Port of Melbourne and those servicing Tasmania could eventually use ports either at Geelong or Hastings.
Share
Facebook Twitter LinkedIn Pinterest Email

THE latest “discussion paper” released by Infrastructure Victoria estimates building a container port at Hastings will cost more than double that of developing a new port at Bay West, inside Port Phillip.

Using scenarios based on ships capable of carrying either 14,000 TEU (based on 20 foot long containers) or 18,500 TEU, the paper puts the cost of developing Hastings to handle nine million TEU a year brought in by the smaller vessels at $12.8 billion; building Bay West for the same number of containers is $6.14 billion.

When the larger ships are taken into account, costs at Hastings go to $12.9 billion as opposed to $6.4 billion at Bay West. 

Taken to their ultimate third stage of development, a container port at Bay West would require close to 30 million cubic metres of dredging and 47 million cubic metres for Hastings.

The Bay West proposal near Werribee involves using dredged material to build an “island”.

Material dredged from Western Port would have to be dumped 50 kilometres offshore in Bass Strait, with 18 million cubic metres of suitable sand then being brought back from the same area for reclamation works.

The 30 kilometres of shipping channels into Western Port will need 2.6 million cubic metres of dredging to accommodate the larger ships (18,500 TEU), but the actual port area will require a further 21.6 million cubic metres of dredging.

The Bay West/Hastings comparison is designed to help the state government choose one of the two sites for the state’s next container port.

Infrastructure Victoria states that while it might be “technically possible” to increase capacity at the Port of Melbourne “by four or five times” it is also working towards finding a “tipping point” as to “when it may be more practical to create additional port capacity at a second container port”.

As it edges closer to recommending either Hastings or Bay West as the site for a second container port, Infrastructure Victoria has ruled out Geelong or Portland.

With a required lead-in time of 15 years for planning and construction of a new port, the government agency is set to make its preferences known to the state government in May.

The paper released earlier this month by Infrastructure Victoria, states that modelling has shown that up until 2066 there will be no problems handling the number of ships expected to pass through The Heads into Port Phillip.

“If growth in ship numbers were to continue as forecast then the ultimate capacity constraint would not be reached until sometime in the mid-2100s,” the discussion paper states.

It cautions that if the largest container ships are to use Port Phillip, the Great Ship Channel will need to be widened from its present 245 metres to 425 metres; the entrance to Western Port would need “some realignment”.

Infrastructure Victoria CEO Michel Masson said the body of evidence is the result of many months of technical investigations and engagement with stakeholders and local communities.

“We have used existing studies, undertaken new technical investigations and consulted with key stakeholders and local communities over the past six months to develop this evidence base on when we might need a new port, and where it should be located,” he said.

“This is not our advice to the government, it is the information, data and analysis we have collected to date.”

Westernport Peninsula Protection Council secretary Karri Giles said the amount of dredging needed for a container port at Hastings was “more than double Port Phillip Bay’s infamous channel deepening”.

Western Port would be “permanently muddy”.

“Infrastructure Victoria thinks the main reason to build a second container port is in case retailers want to bring in goods in the world’s second biggest ships. Most right thinking people here would rather the ships fit the port than build a whole new port to take bigger ships,” Ms Giles said.

The discussion paper and technical reports are at yoursay.infrastructurevictoria.com.au/ports

First published in the Frankston Times – 20 March 2017

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Keith Platt
Keith Platt

Related Posts

Invalidated votes approved again

8 May 2025

Council releases draft budget

7 May 2025

Kingston councillors debate standing down process

7 May 2025
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

29 April 2025
Peninsula Kids Magazine

Click Here to Read

1 May 2025
Property of the Week

34 Pine Hill Drive, Frankston

21 March 2025
Council Watch

Council budget in the works

16 January 2025

Council rate cap set

7 January 2025
100 Years Ago this Week

A Dangerous Dog – Child claims damages after being bitten

6 May 2025
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.