Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Saturday, July 5
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
Breaking News
Bayside News
Home»News»Roadwork pain ahead
News

Roadwork pain ahead

Bayside NewsBy Bayside News24 February 2021Updated:24 February 2021No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

MOTORISTS will be faced with more road closures this week as work continues on the Mordialloc Freeway project.

Centre Dandenong Road between Boundary and Tootal roads will close from 8pm Friday 26 February to 5am Monday 1 March. Beams will be lifted into place for the freeway bridge over the road.

While the road is closed, detours will be in place via Old Dandenong Road or Lower Dandenong Road. Pedestrian access along Centre Dandenong Road will also be cut off between 11pm and 9am, with detours via Howard and Lower Dandenong roads.

Springvale Road between Wells and Pillars roads is closed nightly until 5.30am on Thursday 25 February. Vehicles will be sent on detours down Wells and Governor roads while work is underway to asphalt new lanes.

Major Roads Project Victoria has also announced that the southbound lanes on the Mornington Peninsula Freeway between Springvale Road and Thames Promenade will close for a night next month.

The road will be blocked from 9pm Saturday 13 March until 9am Sunday 14 March to install new drainage. While the work is undertaken, access from Springvale Road onto the Mornington Peninsula Freeway will be closed. Detours will be in place via Wells Road and Thames Promenade.

First published in the Chelsea Mordialloc Mentone News – 24 February 2021

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Bayside News
Bayside News

Related Posts

Tree milestone met

4 July 2025

Advocates celebrate abuse law change

3 July 2025

More money for emergency relief

3 July 2025
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

1 July 2025
Peninsula Kids Magazine

Click Here to Read

3 June 2025
Property of the Week

34 Pine Hill Drive, Frankston

21 March 2025
Council Watch

Council considers LGBTQIA+ initiatives

11 June 2025

New conditions applied to grants

4 June 2025
100 Years Ago this Week

Baxter – On The ‘Wallaby’ with a walking group

1 July 2025
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.