Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Sunday, March 8
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Crossing removal works resume
News

Crossing removal works resume

Bayside NewsBy Bayside News4 October 2021Updated:6 October 2021No Comments2 Mins Read
Facebook Twitter LinkedIn Email Reddit Threads Copy Link
Share
Facebook Twitter LinkedIn Email Reddit Threads Copy Link

CONSTRUCTION on all level crossing removal projects will resume from today (Tuesday 5 October), after a 2-week industry-wide shutdown to reduce the spread of COVID-19.

Workers on major transport infrastructure projects have spent the past two weeks getting vaccinated to help keep worksites and the community safe.

Strict processes will be in place to check and record the vaccination status of workers entering construction sites.

Over the next few days, Victorians may notice some workers returning to site to prepare for work starting again next week.

The Level Crossing Removal Project is currently resequencing their construction schedule to determine new end dates for our major construction blitzes on the and Frankston line.

Ventilation plans have been put in place for indoor rest areas to ensure worksites are complying with new construction public health orders, requiring the entire air volume of crib/meal rooms to be replaced or filtered five to six times an hour, or around every 10 to 12 minutes.

Additional measures making worksites even safer include new physical distancing markers, better ventilation in site sheds and the presence of COVID-19 safety marshals.

Compliance and safety teams have conducted almost 11,000 checks across sites during the pandemic. These inspections will ramp up in the coming weeks.

“We’ve worked closely with our building partners, the unions and broader construction industry to get our worksites and workers reset and ready to restart work on 5 October.” said a spokeperson for the Level Crossing Removal Project.

“This is a challenging time for Victoria, and we are focused on boosting our safety efforts even further to slow the spread of coronavirus and keep building big for Victoria.”

First published in the Frankston Times – 5 October 2021

Bayside News
Bayside News

Related Posts

Further two charged following alleged crime spree

6 March 2026

Community consultation on Australia Day

5 March 2026

Frankston hosts AI learning centre

5 March 2026
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

2 February 2026
Peninsula Kids Magazine

Click Here to Read

9 December 2025
Property of the Week

563 Nepean Highway, FRANKSTON

20 January 2026
Council Watch

Submissions open on vacant shop rates

24 February 2026

Overseas junket a ‘success’ – mayor

25 November 2025
100 Years Ago this Week

Benefit Concert in aid of Bush Fire Relief Fund

5 March 2026
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.