Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Friday, March 6
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Bay Trail works begin
News

Bay Trail works begin

Bayside NewsBy Bayside News3 June 2015Updated:18 July 2024No Comments2 Mins Read
Facebook Twitter LinkedIn Email Reddit Threads Copy Link
Share
Facebook Twitter LinkedIn Email Reddit Threads Copy Link

WORKS have begun on the “missing piece” of the Bay Trail after the Victorian Civil and Administrative Tribunal endorsed Kingston Council’s plans for the project (‘Bay Trail gets VCAT go ahead’, The News 9/4/15).

This will allow a 600 metre section at Mentone to complete the continuous bike path around Port Phillip Bay.

The three-metre wide path next to Beach Road will run from Charman Rd to the Mentone Lifesaving Club. A reconfiguration of the Mundy St car park will allow the new path to link up with existing sections of the Bay Trail.

Some vegetation along Beach Rd has been removed, which the council says it will compensate for with off-set plantings elsewhere and other vegetation and weed control works.

The mayor Cr Geoff Gledhill said the project had been discussed for many years and he was pleased residents would soon be able to enjoy the results.

“This is a valuable community project that will make it easier and safer for the community to walk, ride and run along our beautiful foreshore area,” he said.

“I’m pleased that VCAT agreed that the project would cause only a ‘negligible’ loss of native vegetation that would be compensated by off-set planning.”

Construction works will take about two months, depending on weather conditions.

Some traffic and parking changes will occur in the area during the construction works, which may affect travel times in the area.

First published in the Chelsea Mordialloc Mentone News – 3 June 2015

Bayside News
Bayside News

Related Posts

Further two charged following alleged crime spree

6 March 2026

Community consultation on Australia Day

5 March 2026

Frankston hosts AI learning centre

5 March 2026
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

2 February 2026
Peninsula Kids Magazine

Click Here to Read

9 December 2025
Property of the Week

563 Nepean Highway, FRANKSTON

20 January 2026
Council Watch

Submissions open on vacant shop rates

24 February 2026

Overseas junket a ‘success’ – mayor

25 November 2025
100 Years Ago this Week

Benefit Concert in aid of Bush Fire Relief Fund

5 March 2026
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.