Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Friday, March 20
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Kananook train stabling yard works completed
News

Kananook train stabling yard works completed

BaysideNewsBy BaysideNews7 October 2025No Comments2 Mins Read
Facebook Twitter LinkedIn Email Reddit Threads Copy Link
A new X’Trapolis 2.0 train is put through the new Kananook train wash. Picture: Supplied
Share
Facebook Twitter LinkedIn Email Reddit Threads Copy Link

THE final stage of works to upgrade the Kananook Train Stabling Yard has been completed, with Frankston Line trains now able to be serviced, washed and stabled at the facility, helping to deliver more reliable services for passengers.

The upgraded yard comprises a modern new train wash, a new train maintenance facility, staff facilities and increased stabling capacity, from 8 trains to 21. An additional rail connection to the Frankston Line has also been built to enable trains to easily enter and exit the site.

It follows the first stage of upgrade works, completed in May 2020 as part of the Carrum level crossing removal works, and the addition of a new high-tech signal control centre and improved driver facilities in 2022.

Increasing capacity to stable more trains at Kananook near the start of the Frankston Line will allow train services to run more efficiently. Passengers are also set to benefit with the introduction of the new X’Trapolis 2.0 trains, currently undergoing testing across the network ahead of their phased roll out on the Frankston, Craigieburn and Upfield lines.

One of the new X’Trapolis 2.0 trains was put through its paces at the Kananook stabling yard last week, testing the new tracks and overhead wiring, finishing with a shiny glow-up in the facility’s new train wash.

The Frankston Line will be level crossing free by 2029.

First published in the Frankston Times – 7 October 2025

Frankston Times Kananook Train Stabling Yard
BaysideNews
BaysideNews

Related Posts

Two charged and drugs, weapons and vehicles seized

19 March 2026

Wheelchair company awarded grant

19 March 2026

Gangs with tobacco links targeted

18 March 2026
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

2 February 2026
Peninsula Kids Magazine

Click Here to Read

9 December 2025
Property of the Week

563 Nepean Highway, FRANKSTON

20 January 2026
Council Watch

Council eyes state election money

2 March 2026

Council considers CEO veto power

25 February 2026
100 Years Ago this Week

Diseased Fruit Trees – Prosecution at Hastings

19 March 2026
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.