Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Friday, March 20
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
Bayside News
Home»News»Starting dates set for rail disruptions
News

Starting dates set for rail disruptions

Brodie CowburnBy Brodie Cowburn5 July 2021Updated:18 July 2024No Comments3 Mins Read
Facebook Twitter LinkedIn Email Reddit Threads Copy Link
FOUR lift shafts, each weighing roughly 15 tonnes, were put into their new home by crane recently at Bonbeach and Chelsea stations. Picture: Supplied
Share
Facebook Twitter LinkedIn Email Reddit Threads Copy Link

COMMUTERS face months of rail and road disruptions while work is completed at Edithvale, Chelsea, and Bonbeach stations.

The three stations will close for reconstruction from 25 July, and will not reopen until November. 

Buses will replace trains between Mordialloc and Frankston and Stony Point from 25 July until 2 August, then from 13 September until November. During the six weeks in between those two closure periods, trains will run express through the three stations.

Road closures and other disruptions are also expected at Edithvale Road, Argyle Avenue, and Bondi Road from July to October.

The level crossing removal at Bondi Road, Bonbeach, will be the 50th completed by the state government.  By the end of this year the level crossings at Edithvale Road and Lochiel Avenue in Edithvale, Chelsea Road and Swanpool Avenue in Chelsea, and Bondi Road in Bonbeach will be gone.

While the Frankston line work is underway, the track will be lowered into trenches and three new stations will be built.

Premier Daniel Andrews said the Level Crossing Removal Project crews had “done an outstanding job removing 46 level crossings to date and we’re thrilled to remove 50 level crossings by the end of 2021 – one year earlier than we promised.”

Acting transport infrastructure minister Ben Carroll said “we know the coming months will be disruptive and inconvenient for train passengers, road users and the local community as our teams work to remove these level crossings and we thank people for their patience while this important work is underway.”

Road users will have to contend with disruptions in the coming months. The following level crossings will be closed: Chelsea Road will close permanently on Sunday 19 July, Argyle Avenue will close from Wednesday 21 July to early October, Bondi Road will close from Friday 23 July to early October, Edithvale Road will close from Sunday 25 July to early October, and Swanpool Avenue will close permanently on Wednesday 29 September.

Thames Promenade will be extended to the Nepean Highway as part of the project, to allow a direct connection to the Mornington Peninsula Freeway and in-progress Mordialloc Freeway.

The state government is spending $3 billion in total on the Frankston line, building 12 new stations and removing 18 level crossings. 

The removal of two level crossings at Glenhuntly by 2024 will make the Frankston line level crossing free between Flinders Street and Moorabbin Station.

Mordialloc MP Tim Richardson said “removing these dangerous and congested level crossings and building three new stations will improve train services and cut commute times for rail passengers, drivers, cyclists and pedestrians — in the process making Edithvale, Chelsea and Bonbeach even better places to live.”

Carrum MP Sonya Kilkenny said  “this has been an outstanding effort by the project team to remove all five level crossings at once – I thank travellers for their patience, but the benefits once they’re gone for good will be worth it.”

To see full details on what works will take place and when, visit bigbuild.vic.gov.au

First published in the Frankston Times – 6 July 2021

Brodie Cowburn
Brodie Cowburn

Related Posts

Two charged and drugs, weapons and vehicles seized

19 March 2026

Wheelchair company awarded grant

19 March 2026

Gangs with tobacco links targeted

18 March 2026
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

2 February 2026
Peninsula Kids Magazine

Click Here to Read

9 December 2025
Property of the Week

563 Nepean Highway, FRANKSTON

20 January 2026
Council Watch

Council eyes state election money

2 March 2026

Council considers CEO veto power

25 February 2026
100 Years Ago this Week

Diseased Fruit Trees – Prosecution at Hastings

19 March 2026
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.