Close Menu
  • Bayside News Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
Facebook X (Twitter) Instagram
Tuesday, July 1
Facebook X (Twitter)
Bayside News
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
Breaking News
Bayside News
Home»News»Station rebuilds on track
News

Station rebuilds on track

Bayside NewsBy Bayside News18 August 2021Updated:18 July 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
WORKERS remove a Frankston line boom gate. Picture: LXRP
Share
Facebook Twitter LinkedIn Pinterest Email

FOUR sets of boom gates have been removed as part of Frankston line level crossing removal works.

Last month between 26 July and 29 July, boom gates were removed at Edithvale Road, Chelsea Road, Argyle Avenue, and Bondi Road.  Bonbeach, Edithvale, and Chelsea stations were all destroyed, with a rebuild imminent.

Trains are now running express through Edithvale, Chelsea, and Bonbeach. This will occur until 13 September when buses will replace trains between Mordialloc, Frankston and Stony Point.

The three rebuilt stations are expected to be open and operational by November.

A statement on the Level Crossing Removal project website read “we understand that the next few months are going to be challenging for residents, traders and commuters — particularly along the Nepean Highway and Station Street — as we deliver one of the biggest projects we’ve undertaken. Completing all the works at once significantly reduces the total disruption period.”

Late last month, the state government announced two more level crossings it would remove along the Frankston line. The boom gates at Parkers Road in Parkdale and Warrigal Road in Mentone are both set to go. The preferred solution for the project is to build rail bridges between Mentone and Parkdale.  (“More level crossings on the chopping block” The News 4/8/21).

First published in the Chelsea Mordialloc Mentone News – 18 August 2021

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Bayside News
Bayside News

Related Posts

Trees fall during wild winds

1 July 2025

Two arrested following alleged road rage

25 June 2025

Council calls for better buses

25 June 2025
Leave A Reply Cancel Reply

Peninsula Essence Magazine

Click Here to Read

1 July 2025
Peninsula Kids Magazine

Click Here to Read

3 June 2025
Property of the Week

34 Pine Hill Drive, Frankston

21 March 2025
Council Watch

Council considers LGBTQIA+ initiatives

11 June 2025

New conditions applied to grants

4 June 2025
100 Years Ago this Week

Baxter – On The ‘Wallaby’ with a walking group

1 July 2025
Interviews

Writing racecourse history

6 February 2024
Contact

Street: 1/15 Wallis Drive, Hastings, 3915
Mailing: PO Box 588, Hastings, 3915

Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Police investigate Bonbeach collision
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.